Docket Detail
| Docket 2008-196-E | |
| Opened On | Friday, May 30, 2008 |
|---|---|
| Status | Open |
| Industry | Electric |
| Summary | Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina |
| Applicants | ||
| South Carolina Electric & Gas Company |
MC C222
220 Operation Way Cayce, SC 29033 |
Phone: 803-217-8141
Fax: 803-217-7931 |
| Representatives | ||
|
Representing South Carolina Electric & Gas Company
Belton T. Zeigler Pope Zeigler, LLC Title: Counsel |
Post Office Box 11509
Columbia, SC 29211 |
Phone: 803-354-4900
Fax: 803-354-4899 bzeigler@popezeigler.com |
|
Representing Office of Regulatory Staff
C. Dukes Scott Office of Regulatory Staff Title: Executive Director |
1401 Main Street, Suite 900
Columbia, SC 29201 |
Phone: 803-737-0800
Fax: cdscott@regstaff.sc.gov |
|
Representing South Carolina Department of Health and Environmental Control (by statute)
Carlisle Roberts South Carolina Department of Health and Environmental Control (by statute) Title: Counsel |
Legal Department
2600 Bull Street Columbia, SC 29201 |
Phone: 803-898-3350
Fax: robertc@dhec.sc.gov |
|
Representing South Carolina Department of Parks, Recreation and Tourism (by statute)
Chad Prosser South Carolina Department of Parks, Recreation and Tourism (by statute) Title: Director |
1205 Pendleton Street, Suite 248
Columbia, SC 29201 |
Phone: 803-734-0166
Fax: 803-734-1409 cprosser@scprt.com |
|
Representing CMC Steel South Carolina
Damon E. Xenopoulos Brickfield Burchette Ritts & Stone, PC Title: Counsel |
1025 Thomas Jefferson Street, NW
8th Floor - West Tower Washington, DC 20007 |
Phone: 202-342-0800
Fax: 202-342-0807 dex@bbrslaw.com |
|
Representing CMC Steel South Carolina
E. Wade Mullins, III Bruner Powell Robbins Wall & Mullins, LLC Title: Counsel |
Post Office Box 61110
Columbia, SC 29260 |
Phone: 803-252-7693
Fax: 803-254-5719 wmullins@brunerpowell.com |
|
Representing Town of Jenkinsville
Honorable Gregrey Ginyard Town of Jenkinsville Title: Mayor |
Town of Jenkinsville
366 Lakeview Drive Jenkinsville, SC 29065 |
Phone:
Fax: |
|
Representing South Carolina Department of Natural Resources (by statute)
John E. Frampton South Carolina Department of Natural Resources (by statute) Title: Director |
**Mailing Address**
Post Office Box 167 Columbia, SC 29202 |
Phone: 803-734-4007
Fax: FramptonJ@dnr.sc.gov |
|
Representing Joseph Wojcicki
Joseph Wojcicki {No Organization Name Listed} |
820 East Steele Road
West Columbia, SC 29170 |
Phone:
Fax: joe4solar@aol.com |
|
Representing South Carolina Electric & Gas Company
K. Chad Burgess South Carolina Electric & Gas Company Title: Senior Counsel |
MC C222
220 Operation Way Cayce, SC 29033-3701 |
Phone: 803-217-8141
Fax: 803-217-7931 chad.burgess@scana.com |
|
Representing Lawrence P. Newton
Lawrence P. Newton {No Organization Name Listed} |
57 Grove Hall Lane
Columbia, SC 29212 |
Phone: 803-238-9558
Fax: 866-686-3508 |
|
Representing Maxine Warshauer and Samuel Baker
Maxine Warshauer {No Organization Name Listed} |
3526 Boundbrook Lane
Columbia, SC 29206 |
Phone: 803-787-4332
Fax: meira28@sc.rr.com |
|
Representing Mildred A. McKinley
Mildred A. McKinley {No Organization Name Listed} |
2021 Carroll Drive
West Columbia, SC 29169 |
Phone: 803-739-6927
Fax: manne57@bellsouth.net |
|
Representing South Carolina Electric & Gas Company
Mitchell Willoughby Willoughby & Hoefer, P.A. Title: Counsel |
Post Office Box 8416
Columbia, SC 29202 |
Phone: 803-252-3300
Fax: 803-256-8062 mwilloughby@willoughbyhoefer.com |
|
Representing Office of Regulatory Staff
Nanette S. Edwards Office of Regulatory Staff Title: Counsel |
1401 Main Street, Suite 900
Columbia, SC 29201 |
Phone: 803-737-0800
Fax: 803-737-0895 nsedwar@regstaff.sc.gov |
|
Representing Pamela Greenlaw
Pamela Greenlaw {No Organization Name Listed} |
1001 Wotan Road
Columbia, SC 29229 |
Phone: 803-736-2977
Fax: pmlgrnlw@yahoo.com |
|
Representing Friends of the Earth
Robert Guild {No Organization Name Listed} Title: Counsel |
314 Pall Mall Street
Columbia, SC 29201 |
Phone: 803-252-1419
Fax: bguild@mindspring.com |
|
Representing South Carolina Energy Users Committee
Scott Elliott Elliott & Elliott, P.A. Title: Counsel |
721 Olive Street
Columbia, SC 29205 |
Phone: 803-771-0555
Fax: 803-771-8010 selliott@elliottlaw.us |
|
Representing Office of Regulatory Staff
Shannon Bowyer Hudson Office of Regulatory Staff Title: Counsel |
1401 Main Street, Suite 900
Columbia, SC 29201 |
Phone: 803-737-0889
Fax: 803-737-0895 shudson@regstaff.sc.gov |
| Intervenors | ||
| CMC Steel South Carolina |
310 New State Road
Cayce, SC 29033 |
Phone:
Fax: |
| Friends of the Earth |
, |
Phone:
Fax: |
| Maxine Warshauer and Samuel Baker |
3526 Boundbrook Lane
Columbia, SC 29206 |
Phone: 803-787-4332
Fax: |
| Office of Regulatory Staff |
1401 Main Street, Suite 900
Columbia, SC 29201 |
Phone:
Fax: |
| Pamela Greenlaw |
1001 Wotan Road
Columbia , SC 29229 |
Phone: 803-736-2997
Fax: |
| South Carolina Department of Health and Environmental Control (by statute) |
2600 Bull Street
Columbia, SC 29201 |
Phone:
Fax: |
| South Carolina Department of Natural Resources (by statute) |
**Street Address**
1000 Assembly Street Columbia, SC 29201 |
Phone:
Fax: |
| South Carolina Department of Parks, Recreation and Tourism (by statute) |
1205 Pendleton Street
Columbia , SC 29201 |
Phone:
Fax: |
| South Carolina Energy Users Committee |
, |
Phone:
Fax: |
| Town of Jenkinsville |
366 Lakeview Drive
Jenkinsville, SC 29065 |
Phone:
Fax: |
|
Joseph Wojcicki
{No Organization Name Listed} |
820 East Steele Raod
West Columbia, SC 29170 |
Phone:
Fax: joe4solar@aol.com |
|
Lawrence P. Newton
{No Organization Name Listed} |
57 Grove Hall Lane
Columbia, SC 29212 |
Phone: 803-238-9558
Fax: 866-686-3508 |
|
Mildred A. McKinley
{No Organization Name Listed} |
2021 Carroll Drive
West Columbia, SC 29169 |
Phone: 803-739-6927
Fax: manne57@bellsouth.net |
| Protestants | ||
|
Leslie Minerd
{No Organization Name Listed} |
2716 Blossom Street
Columbia, SC 29205 |
Phone:
Fax: |
| Matters (showing 25 most recent, to see all click here) | ||||
| MatterID | Type | Summary | Date | PDF(s) |
| 221618 | Directive |
Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Commission Directive - Agenda Item #6 - Discuss This Matter with the Commission On behalf of: Docketing Department |
1/27/2010 |
Directive |
| 221228 | Letter |
Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Revised Request for Additional Information Necessary for Proper National Energy Future Decisions On behalf of: Joseph Wojcicki |
1/14/2010 |
Scanned Matter |
| 221150 | Request |
Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Request for Additional Information Necessary for Proper National Energy Future Decisions On behalf of: Joseph Wojcicki |
1/13/2010 |
Scanned Matter |
| 221218 | Directive |
Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Commission Directive - Agenda Item #8 - Discuss with the Commission a Request to Be Removed as a Party of Record in This Matter Filed on Behalf of Ruth Thomas, Intervenor On behalf of: Docketing Department |
1/13/2010 |
Directive |
| 220942 | Request |
Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Request to Be Removed as a Party of Record in This Matter On behalf of: Ruth Thomas, Intervenor |
12/31/2009 |
Scanned Matter |
| 220865 | Directive |
Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Commission Directive - Agenda Item #11 - Discuss with the Commission South Carolina Electric & Gas Company's Request for Confidential Treatment of Appendices 2, 3 and 4A of the Quarterly Report for the Period Ending September 30, 2009, Related to the Construction of V.C. Summer Nuclear Station Units 2 and 3 On behalf of: Docketing Department |
12/17/2009 |
Directive |
| 220316 | Report |
Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Quarterly Report Concerning Construction of V.C. Summer Nuclear Station Units 2 and 3 and a Request for Confidential Treatment On behalf of: South Carolina Electric & Gas Company |
11/17/2009 |
Quarterly Report |
| 218474 | Letter |
Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Letter with Attached Order On behalf of: The Supreme Court of South Carolina |
8/7/2009 |
Scanned Matter |
| 218475 | Letter |
Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Letter On behalf of: The Supreme Court of South Carolina |
8/7/2009 |
Scanned Matter |
| 218000 | Letter |
Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Letter and Motion to Enlarge Time Filed with the Supreme Court of South Carolina On behalf of: South Carolina Energy Users Committee |
7/20/2009 |
Scanned Matter |
| 217957 | Letter |
Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Letter with Attachments On behalf of: Friends of the Earth |
7/17/2009 |
Scanned Matter |
| 217890 | Letter |
Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Letter On behalf of: The Supreme Court of South Carolina |
7/14/2009 |
Scanned Matter |
| 217493 | Letter |
Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Letter Requesting Clarification On behalf of: South Carolina Electric & Gas Company |
7/2/2009 |
Scanned Matter |
| 217449 | Letter |
Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Letter and Return on Motion Filed with the Supreme Court of South Carolina On behalf of: South Carolina Electric & Gas Company |
7/1/2009 |
Scanned Matter |
| 217395 | General Matter |
Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Letter Addressed to the Supreme Court of South Carolina On behalf of: Maxine Warshauer, Lawrence P. Newton, Ruth S. Thomas, Mildred A. McKinley, Pamela Greenlaw and Samuel L. Baker |
6/26/2009 |
Scanned Matter |
| 217398 | General Matter |
Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Letter Addressed to the Supreme Court of South Carolina On behalf of: Friends of the Earth |
6/26/2009 |
Scanned Matter |
| 217369 | Letter |
Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Letter to the Honorable Daniel E. Shearouse, Clerk of the Supreme Court of South Carolina On behalf of: South Carolina Electric & Gas Company |
6/25/2009 |
Scanned Matter |
| 217370 | Motion |
Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Letter and Motion Filed with the Supreme Court of South Carolina Regarding Appeal of Orders 2009-104A and 2009-218 On behalf of: South Carolina Energy Users Committee |
6/25/2009 |
Scanned Matter |
| 217272 | Letter |
Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South - Letter Addressed to the Supreme Court of South Carolina On behalf of: South Carolina Energy Users Committee |
6/16/2009 |
Scanned Matter |
| 216944 | General Matter |
Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Notice of Appeal On behalf of: Friends of the Earth |
5/26/2009 |
Scanned Matter |
| 216905 | General Matter |
Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Notice of Appeal On behalf of: South Carolina Energy Users Committee |
5/22/2009 |
Notice of Appeal |
| 216763 | Report |
Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Quarterly Report Ending March 31, 2009 Concerning Construction of V.C. Summer Nuclear Station Units 2 and 3 On behalf of: South Carolina Electric and Gas Company |
5/15/2009 |
Scanned Matter |
| 215920 | General Matter |
Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Consequences On behalf of: Joseph Wojcicki |
3/25/2009 |
Scanned Matter |
| 215929 | Directive |
Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Commission Directive - Agenda Item # 8 - Discuss with the Commission the Petition for Rehearing or Reconsideration on Behalf of the Friends of the Earth, the Petition for Reconsideration Filed on Behalf of South Carolina Energy Users Committee, and the Petition for Rehearing or Reconsideration Filed by Joseph Wojcicki On behalf of: Docketing Department |
3/25/2009 |
Directive |
| 215902 | General Matter |
Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Errata to Consequences On behalf of: Joseph Wojcicki |
3/24/2009 |
Scanned Matter |
| (showing 25 most recent, to see all click here) | ||||
| Orders | |||
| Order# | Summary | Date | PDF(s) |
| 2010-108 | Order Denying Request - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina | 2/2/2010 |
Order Number 2010-108 |
| 2010-35 | Order - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina | 1/13/2010 |
Order Number 2010-35 |
| 2009-888 | Order Granting Request for Confidential Treatment - Application of South Carolina Electric & Gas Company's Request for Approval of Contract for Electric Service with Mars Petcare US, Incorporated | 12/17/2009 |
Order No. 2009-888 |
| 2009-218 | Order Denying Petitions - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina | 4/21/2009 |
Order Number 2009-218 |
| 2009-172 | Order Dismissing Petition Without Prejudice - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina | 3/25/2009 |
Order Number 2009-172 |
| 2009-104 | Order Approving Combined Application - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina | 2/27/2009 |
Order Number 2009-104 |
| 2009-104(A) | Order No. 2009-104-(A) - Amended Order Approving Combined Application - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina | 3/2/2009 |
Order Number 2009-104(A) |
| 2008-797 | Order Granting Authority to Act on Behalf of Ms. Ruth Thomas in Regard to Presentation of Witness - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina | 11/18/2008 |
Order Number 2008-797 |
| 2008-756 | Order on Intervenor Response to ORS Motion to File and Present Panel Testimony - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina | 11/6/2008 |
Order Number 2008-756 |
| 2008-752 | Order Granting Motion for Confidential Treatment - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina | 11/6/2008 |
Order Number 2008-752 |
| 2008-739 | Order Amending Order No. 2008-696 - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina | 10/28/2008 |
Order Number 2008-739 |
| 2008-724 | Procedural Order on Form of ORS Testimony - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina | 10/22/2008 |
Order Number 2008-724 |
| 2008-696 | Order Granting Request for Confidential Treatment - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina | 10/9/2008 |
Order Number 2008-696 |
| 2008-673 | Order Permitting Commencement of Initial Construction Activities - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina | 10/7/2008 |
Order Number 2008-673 |
| 2008-601 | Order Appointing Hearing Officer - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina | 8/26/2008 |
Order Number 2008-601 |
| 2008-570 | Order on Hearing - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina | 8/19/2008 |
Order Number 2008-570 |
| 2008-565 | Order Granting Admission Pro Hac Vice - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina | 8/14/2008 |
Order Number 2008-565 |
| 2008-467 | Order Granting Confidentiality and a Protective Order - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina | 7/8/2008 |
Order Number 2008-467 |
| Timeline | |
| Event | Date |
| Application Received | |
| Issue Final Order | |
| Proof Pub Due For Merits Hearing | 7/31/08 |
| Return Date | 8/20/08 |
| Applicant/Complainant/Petitioner Testimony Due | 9/16/08 |
| All Other Parties Due Date | 10/17/08 |
| Rebuttal Testimony Due Date | 10/31/08 |
| Surrebuttal Testimony Due Date | 11/14/08 |
| Hearings | ||
| Date | Status | Notes |
| Monday, October 27, 2008 @ 10:30 AM | Re-Scheduled | Beginning on Monday, Oct. 27, 2008 at 10:30 a.m. and continuing through Friday, Oct. 31, 2008, if necessary |
| Wednesday, September 10, 2008 @ 12:30 PM | Scheduled | Hearing to address request to conduct clearing, excavation, construction work & rail line |
| Wednesday, August 27, 2008 @ 10:00 AM | Scheduled | Prehearing Conference |
| Monday, December 1, 2008 @ 9:30 AM | Scheduled | To continue as necessary |
| Tuesday, December 2, 2008 @ 9:30 AM | Scheduled | To continue as necessary |
| Wednesday, December 3, 2008 @ 9:30 AM | Scheduled | To continue as necessary |
| Thursday, December 4, 2008 @ 9:30 AM | Scheduled | To continue as necessary |
| Friday, December 5, 2008 @ 9:30 AM | Scheduled | To continue as necessary |
| Tuesday, December 9, 2008 @ 9:30 AM | Scheduled | Continued as necessary |
| Wednesday, December 10, 2008 @ 9:30 AM | Scheduled | continued as necessary - start time is at the call of the Chairman |
| Thursday, December 11, 2008 @ 2:00 PM | Scheduled | continued as necessary - start time is at the call of the Chairman |
| Tuesday, December 16, 2008 @ 2:00 PM | Scheduled | |
| Wednesday, December 17, 2008 @ 9:30 AM | Scheduled | continued as necessary - start time is at the call of the Chairman |
| Thursday, December 18, 2008 @ 9:30 AM | Scheduled | continued as necessary - start time is at the call of the Chairman |