 Docket Detail

Docket 2008-196-E
Opened On Friday, May 30, 2008
Status Open
Industry Electric
Summary Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina
Applicants
South Carolina Electric & Gas Company MC C222
220 Operation Way
Cayce, SC 29033
Phone: 803-217-8141
Fax: 803-217-7931
Representatives
Representing South Carolina Electric & Gas Company
Belton T. Zeigler
Pope Zeigler, LLC
Title: Counsel
Post Office Box 11509
Columbia, SC 29211
Phone: 803-354-4900
Fax: 803-354-4899
bzeigler@popezeigler.com
Representing Office of Regulatory Staff
C. Dukes Scott
Office of Regulatory Staff
Title: Executive Director
1401 Main Street, Suite 900
Columbia, SC 29201
Phone: 803-737-0800
Fax:
cdscott@regstaff.sc.gov
Representing South Carolina Department of Health and Environmental Control (by statute)
Carlisle Roberts
South Carolina Department of Health and Environmental Control (by statute)
Title: Counsel
Legal Department
2600 Bull Street
Columbia, SC 29201
Phone: 803-898-3350
Fax:
robertc@dhec.sc.gov
Representing South Carolina Department of Parks, Recreation and Tourism (by statute)
Chad Prosser
South Carolina Department of Parks, Recreation and Tourism (by statute)
Title: Director
1205 Pendleton Street, Suite 248
Columbia, SC 29201
Phone: 803-734-0166
Fax: 803-734-1409
cprosser@scprt.com
Representing CMC Steel South Carolina
Damon E. Xenopoulos
Brickfield Burchette Ritts & Stone, PC
Title: Counsel
1025 Thomas Jefferson Street, NW
8th Floor - West Tower
Washington, DC 20007
Phone: 202-342-0800
Fax: 202-342-0807
dex@bbrslaw.com
Representing CMC Steel South Carolina
E. Wade Mullins, III
Bruner Powell Robbins Wall & Mullins, LLC
Title: Counsel
Post Office Box 61110
Columbia, SC 29260
Phone: 803-252-7693
Fax: 803-254-5719
wmullins@brunerpowell.com
Representing Town of Jenkinsville
Honorable Gregrey Ginyard
Town of Jenkinsville
Title: Mayor
Town of Jenkinsville
366 Lakeview Drive
Jenkinsville, SC 29065
Phone:
Fax:
Representing South Carolina Department of Natural Resources (by statute)
John E. Frampton
South Carolina Department of Natural Resources (by statute)
Title: Director
**Mailing Address**
Post Office Box 167
Columbia, SC 29202
Phone: 803-734-4007
Fax:
FramptonJ@dnr.sc.gov
Representing Joseph Wojcicki
Joseph Wojcicki
{No Organization Name Listed}
820 East Steele Road
West Columbia, SC 29170
Phone:
Fax:
joe4solar@aol.com
Representing South Carolina Electric & Gas Company
K. Chad Burgess
South Carolina Electric & Gas Company
Title: Senior Counsel
MC C222
220 Operation Way
Cayce, SC 29033-3701
Phone: 803-217-8141
Fax: 803-217-7931
chad.burgess@scana.com
Representing Lawrence P. Newton
Lawrence P. Newton
{No Organization Name Listed}
57 Grove Hall Lane
Columbia, SC 29212
Phone: 803-238-9558
Fax: 866-686-3508
Representing Maxine Warshauer and Samuel Baker
Maxine Warshauer
{No Organization Name Listed}
3526 Boundbrook Lane
Columbia, SC 29206
Phone: 803-787-4332
Fax:
meira28@sc.rr.com
Representing Mildred A. McKinley
Mildred A. McKinley
{No Organization Name Listed}
2021 Carroll Drive
West Columbia, SC 29169
Phone: 803-739-6927
Fax:
manne57@bellsouth.net
Representing South Carolina Electric & Gas Company
Mitchell Willoughby
Willoughby & Hoefer, P.A.
Title: Counsel
Post Office Box 8416
Columbia, SC 29202
Phone: 803-252-3300
Fax: 803-256-8062
mwilloughby@willoughbyhoefer.com
Representing Office of Regulatory Staff
Nanette S. Edwards
Office of Regulatory Staff
Title: Counsel
1401 Main Street, Suite 900
Columbia, SC 29201
Phone: 803-737-0800
Fax: 803-737-0895
nsedwar@regstaff.sc.gov
Representing Pamela Greenlaw
Pamela Greenlaw
{No Organization Name Listed}
1001 Wotan Road
Columbia, SC 29229
Phone: 803-736-2977
Fax:
pmlgrnlw@yahoo.com
Representing Friends of the Earth
Robert Guild
{No Organization Name Listed}
Title: Counsel
314 Pall Mall Street
Columbia, SC 29201
Phone: 803-252-1419
Fax:
bguild@mindspring.com
Representing South Carolina Energy Users Committee
Scott Elliott
Elliott & Elliott, P.A.
Title: Counsel
721 Olive Street
Columbia, SC 29205
Phone: 803-771-0555
Fax: 803-771-8010
selliott@elliottlaw.us
Representing Office of Regulatory Staff
Shannon Bowyer Hudson
Office of Regulatory Staff
Title: Counsel
1401 Main Street, Suite 900
Columbia, SC 29201
Phone: 803-737-0889
Fax: 803-737-0895
shudson@regstaff.sc.gov
Intervenors
CMC Steel South Carolina 310 New State Road
Cayce, SC 29033
Phone:
Fax:
Friends of the Earth
,
Phone:
Fax:
Maxine Warshauer and Samuel Baker 3526 Boundbrook Lane
Columbia, SC 29206
Phone: 803-787-4332
Fax:
Office of Regulatory Staff 1401 Main Street, Suite 900
Columbia, SC 29201
Phone:
Fax:
Pamela Greenlaw 1001 Wotan Road
Columbia , SC 29229
Phone: 803-736-2997
Fax:
South Carolina Department of Health and Environmental Control (by statute) 2600 Bull Street
Columbia, SC 29201
Phone:
Fax:
South Carolina Department of Natural Resources (by statute) **Street Address**
1000 Assembly Street
Columbia, SC 29201
Phone:
Fax:
South Carolina Department of Parks, Recreation and Tourism (by statute) 1205 Pendleton Street
Columbia , SC 29201
Phone:
Fax:
South Carolina Energy Users Committee
,
Phone:
Fax:
Town of Jenkinsville 366 Lakeview Drive
Jenkinsville, SC 29065
Phone:
Fax:
Joseph Wojcicki
{No Organization Name Listed}
820 East Steele Raod
West Columbia, SC 29170
Phone:
Fax:
joe4solar@aol.com
Lawrence P. Newton
{No Organization Name Listed}
57 Grove Hall Lane
Columbia, SC 29212
Phone: 803-238-9558
Fax: 866-686-3508
Mildred A. McKinley
{No Organization Name Listed}
2021 Carroll Drive
West Columbia, SC 29169
Phone: 803-739-6927
Fax:
manne57@bellsouth.net
Protestants
Leslie Minerd
{No Organization Name Listed}
2716 Blossom Street
Columbia, SC 29205
Phone:
Fax:
Matters (showing 25 most recent, to see all click here)
MatterID Type Summary Date PDF(s)
221618 Directive Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Commission Directive - Agenda Item #6 - Discuss This Matter with the Commission
On behalf of: Docketing Department
1/27/2010 Directive
221228 Letter Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Revised Request for Additional Information Necessary for Proper National Energy Future Decisions
On behalf of: Joseph Wojcicki
1/14/2010 Scanned Matter
221150 Request Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Request for Additional Information Necessary for Proper National Energy Future Decisions
On behalf of: Joseph Wojcicki
1/13/2010 Scanned Matter
221218 Directive Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Commission Directive - Agenda Item #8 - Discuss with the Commission a Request to Be Removed as a Party of Record in This Matter Filed on Behalf of Ruth Thomas, Intervenor
On behalf of: Docketing Department
1/13/2010 Directive
220942 Request Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Request to Be Removed as a Party of Record in This Matter
On behalf of: Ruth Thomas, Intervenor
12/31/2009 Scanned Matter
220865 Directive Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Commission Directive - Agenda Item #11 - Discuss with the Commission South Carolina Electric & Gas Company's Request for Confidential Treatment of Appendices 2, 3 and 4A of the Quarterly Report for the Period Ending September 30, 2009, Related to the Construction of V.C. Summer Nuclear Station Units 2 and 3
On behalf of: Docketing Department
12/17/2009 Directive
220316 Report Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Quarterly Report Concerning Construction of V.C. Summer Nuclear Station Units 2 and 3 and a Request for Confidential Treatment
On behalf of: South Carolina Electric & Gas Company
11/17/2009 Quarterly Report
218474 Letter Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Letter with Attached Order
On behalf of: The Supreme Court of South Carolina
8/7/2009 Scanned Matter
218475 Letter Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Letter
On behalf of: The Supreme Court of South Carolina
8/7/2009 Scanned Matter
218000 Letter Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Letter and Motion to Enlarge Time Filed with the Supreme Court of South Carolina
On behalf of: South Carolina Energy Users Committee
7/20/2009 Scanned Matter
217957 Letter Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Letter with Attachments
On behalf of: Friends of the Earth
7/17/2009 Scanned Matter
217890 Letter Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Letter
On behalf of: The Supreme Court of South Carolina
7/14/2009 Scanned Matter
217493 Letter Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Letter Requesting Clarification
On behalf of: South Carolina Electric & Gas Company
7/2/2009 Scanned Matter
217449 Letter Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Letter and Return on Motion Filed with the Supreme Court of South Carolina
On behalf of: South Carolina Electric & Gas Company
7/1/2009 Scanned Matter
217395 General Matter Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Letter Addressed to the Supreme Court of South Carolina
On behalf of: Maxine Warshauer, Lawrence P. Newton, Ruth S. Thomas, Mildred A. McKinley, Pamela Greenlaw and Samuel L. Baker
6/26/2009 Scanned Matter
217398 General Matter Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Letter Addressed to the Supreme Court of South Carolina
On behalf of: Friends of the Earth
6/26/2009 Scanned Matter
217369 Letter Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Letter to the Honorable Daniel E. Shearouse, Clerk of the Supreme Court of South Carolina
On behalf of: South Carolina Electric & Gas Company
6/25/2009 Scanned Matter
217370 Motion Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Letter and Motion Filed with the Supreme Court of South Carolina Regarding Appeal of Orders 2009-104A and 2009-218
On behalf of: South Carolina Energy Users Committee
6/25/2009 Scanned Matter
217272 Letter Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South - Letter Addressed to the Supreme Court of South Carolina
On behalf of: South Carolina Energy Users Committee
6/16/2009 Scanned Matter
216944 General Matter Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Notice of Appeal
On behalf of: Friends of the Earth
5/26/2009 Scanned Matter
216905 General Matter Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Notice of Appeal
On behalf of: South Carolina Energy Users Committee
5/22/2009 Notice of Appeal
216763 Report Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Quarterly Report Ending March 31, 2009 Concerning Construction of V.C. Summer Nuclear Station Units 2 and 3
On behalf of: South Carolina Electric and Gas Company
5/15/2009 Scanned Matter
215920 General Matter Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Consequences
On behalf of: Joseph Wojcicki
3/25/2009 Scanned Matter
215929 Directive Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Commission Directive - Agenda Item # 8 - Discuss with the Commission the Petition for Rehearing or Reconsideration on Behalf of the Friends of the Earth, the Petition for Reconsideration Filed on Behalf of South Carolina Energy Users Committee, and the Petition for Rehearing or Reconsideration Filed by Joseph Wojcicki
On behalf of: Docketing Department
3/25/2009 Directive
215902 General Matter Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Errata to Consequences
On behalf of: Joseph Wojcicki
3/24/2009 Scanned Matter
(showing 25 most recent, to see all click here)
Orders
Order# Summary Date PDF(s)
2010-108 Order Denying Request - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 2/2/2010 Order Number 2010-108
2010-35 Order - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 1/13/2010 Order Number 2010-35
2009-888 Order Granting Request for Confidential Treatment - Application of South Carolina Electric & Gas Company's Request for Approval of Contract for Electric Service with Mars Petcare US, Incorporated 12/17/2009 Order No. 2009-888
2009-218 Order Denying Petitions - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 4/21/2009 Order Number 2009-218
2009-172 Order Dismissing Petition Without Prejudice - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 3/25/2009 Order Number 2009-172
2009-104 Order Approving Combined Application - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 2/27/2009 Order Number 2009-104
2009-104(A) Order No. 2009-104-(A) - Amended Order Approving Combined Application - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 3/2/2009 Order Number 2009-104(A)
2008-797 Order Granting Authority to Act on Behalf of Ms. Ruth Thomas in Regard to Presentation of Witness - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 11/18/2008 Order Number 2008-797
2008-756 Order on Intervenor Response to ORS Motion to File and Present Panel Testimony - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 11/6/2008 Order Number 2008-756
2008-752 Order Granting Motion for Confidential Treatment - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 11/6/2008 Order Number 2008-752
2008-739 Order Amending Order No. 2008-696 - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 10/28/2008 Order Number 2008-739
2008-724 Procedural Order on Form of ORS Testimony - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 10/22/2008 Order Number 2008-724
2008-696 Order Granting Request for Confidential Treatment - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 10/9/2008 Order Number 2008-696
2008-673 Order Permitting Commencement of Initial Construction Activities - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 10/7/2008 Order Number 2008-673
2008-601 Order Appointing Hearing Officer - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 8/26/2008 Order Number 2008-601
2008-570 Order on Hearing - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 8/19/2008 Order Number 2008-570
2008-565 Order Granting Admission Pro Hac Vice - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 8/14/2008 Order Number 2008-565
2008-467 Order Granting Confidentiality and a Protective Order - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 7/8/2008 Order Number 2008-467
Timeline
Event Date
Application Received  
Issue Final Order  
Proof Pub Due For Merits Hearing 7/31/08
Return Date 8/20/08
Applicant/Complainant/Petitioner Testimony Due 9/16/08
All Other Parties Due Date 10/17/08
Rebuttal Testimony Due Date 10/31/08
Surrebuttal Testimony Due Date 11/14/08
Hearings
Date Status Notes
Monday, October 27, 2008 @ 10:30 AM Re-Scheduled Beginning on Monday, Oct. 27, 2008 at 10:30 a.m. and continuing through Friday, Oct. 31, 2008, if necessary
Wednesday, September 10, 2008 @ 12:30 PM Scheduled Hearing to address request to conduct clearing, excavation, construction work & rail line
Wednesday, August 27, 2008 @ 10:00 AM Scheduled Prehearing Conference
Monday, December 1, 2008 @ 9:30 AM Scheduled To continue as necessary
Tuesday, December 2, 2008 @ 9:30 AM Scheduled To continue as necessary
Wednesday, December 3, 2008 @ 9:30 AM Scheduled To continue as necessary
Thursday, December 4, 2008 @ 9:30 AM Scheduled To continue as necessary
Friday, December 5, 2008 @ 9:30 AM Scheduled To continue as necessary
Tuesday, December 9, 2008 @ 9:30 AM Scheduled Continued as necessary
Wednesday, December 10, 2008 @ 9:30 AM Scheduled continued as necessary - start time is at the call of the Chairman
Thursday, December 11, 2008 @ 2:00 PM Scheduled continued as necessary - start time is at the call of the Chairman
Tuesday, December 16, 2008 @ 2:00 PM Scheduled
Wednesday, December 17, 2008 @ 9:30 AM Scheduled continued as necessary - start time is at the call of the Chairman
Thursday, December 18, 2008 @ 9:30 AM Scheduled continued as necessary - start time is at the call of the Chairman